Assistant Project Manager @ Alcon/Novartis (Pharmaceutical) – Process Improvements - $50 Million
Panola College – 2013 Bond Program Projects - $34 Million
• Managed Process and MEP construction work
• Performed pre-construction and project management duties as a CMAR for a new health/science building, new student life center, and gymnasium renovation.
• Provided budgets/estimates as design developed
• Performed constructability and value engineering reviews during design
• Manage submittals, RFI’s and other project documentation as required
• Developed and managing scopes/budgets From February 2014 to Present (1 year 11 months) Construction Manager @ San Antonio Water Systems – Brackish, Program Management - $160 Million
• Provided take-offs and estimation
• Performed planning and technical consultation on air scrubbers and pump stations
San Antonio Water Systems – Regional Carizzo, Program Management - $120 Million
• Developed plan and schedule for commissioning and close out phases for all projects
City of Laredo – 60” Transmission Pipeline – $16 Million
• Reviewed submittals, RFI’s and provided construction phase services assistance
Owner's Engineer Contract with Brownsville Public Utilities Board
• Performed duties including design review and technical consultation
• Provided estimating and scheduling for overall program
• Conducted review/progress meetings during preliminary phase From February 2013 to February 2014 (1 year 1 month) San Antonio, Texas AreaConstruction Engineer @ Salt Water Injection Facilities - $30 Million
• Maintained construction documentation control
• Managed and supervised design-build construction projects for salt water disposal facilities
• Conducted coordination meetings and schedule reviews
• Coordinated sub-contractors and vendors for construction
• Coordinated commissioning and functionality tests for the injection facility
• Assisted in managing design and controlling costs
• Obtained quotes and managed contracts accordingly
• Organized and maintained closeout items such as punch lists and warranty items From July 2012 to February 2013 (8 months) Project Engineer - Construction Management @ Westside Water Treatment Plant - City of Fort Worth - $47 Million
• Provided Construction Management support for Black & Veatch which represented the City of Fort Worth in monitoring the construction phase of a water treatment plant
• Reviewed Specifications / Drawings for compliance inspections during construction
• Conducted meetings between the City, Contractor (McCarthy) and Engineer (CDM)
• Negotiated change orders and provided cost savings suggestions on behalf of the City
Design and Construction Phase
• Designed 12” service water pump and pipe header for Village Creek WRF
• Provided construction phase support including submittal and RFI reviews for DWU projects
• Provided civil design for substations on the TRWD/DWU IPL project From July 2009 to July 2012 (3 years 1 month) Dallas/Fort Worth AreaIndustrial Engineer @ From May 2008 to December 2008 (8 months)
BS, Industrial Engineering @ Texas Tech University From 2004 to 2009 Josh P.E. is skilled in: AutoCAD, Construction, Engineering, Construction Management, Structural Analysis, Civil Engineering, Concrete, Water, Project Engineering, Stormwater Management, Structural Engineering, Site Development, Submittals, Value Engineering, Steel, Change Orders, Contract Management, Pre-construction, Project Management