|
|
|
1-10 employees
View all
|
|
Oil & Energy
|
|
Al-Zour City, Al Ahmadi Governorate, KW
|
|
About Al-Zour Refinery Project:
- The world’s largest grass-root refinery.
- Biggest refinery in one stage in world.
- Generally, One of the largest 10 refineries in the world.
- Producing up to 615,000 barrels per day Kuwait Crudes to produce high value products and fuel oil (5th worldwide) With strategic LSFO storage capacity of 6.5 million barrels
-Designed to process Heavy crudes.
-The Refinery provides a Hydro-skimming facility which can be upgraded to a full conversion Refinery.
-Al-Zour Refinery has six trains of the world’s largest ARDS Units and highly efficient Sulfur Recovery Units with 99.9% recovery.
-The Refinery is provided with a multi-point ground flare system designed for low noise and smokeless operation.
-An integrated flare gas recovery facility ensures recovery of flared gases to minimize hydrocarbon losses.
-Liquid effluents generated from the refinery are treated for maximum reuse with no discharge to the gulf, utilizing Zero Liquid Discharge technology.
Budget: $4.1 Billion Package out of $16 Billion
Client: KNPC (Kuwait National Petroleum Company) & later KIPIC (Kuwait Integrated Petroleum Industries Company).
PMC: Amec Foster Wheeler "UK" & later Wood "UK".
About Package 1 EPC#1 (0055A) Main Processing Units:
The scope of the contract includes: the engineering, supply, construction and commissioning of the following refining units: 3 crude distillation units (210,000 BPSD each), 3 atmospheric residue desulphuration units (110,000 BPSD each), 3 diesel hydrotreating units (62,000 BPSD each), 2 naphtha hyrdrotreating units (18,200 BPSD each), 2 kerosene hydrotreating units (53,000 BPSD each), a saturated gas unit (8,500 BPSD) and a heavy oil cooling unit.
|
TSHJ Al-Zour Refinery Project EPC#1 Email Formats | Example Email Formats | Percentage |
---|---|---|
{f}{last} | [email protected] |
75.00%
|
The widely used TSHJ Al-Zour Refinery Project EPC#1 email format is {f}{last} (e.g. [email protected]) with 75.00% adoption across the company.
To contact TSHJ Al-Zour Refinery Project EPC#1 customer service number in your country click here to find.
Find accurate personal emails, work emails and phone numbers for employees
Accelerate prospecting with instant access to 300M professionals from 30M companies with the right contact details.