Project Engineer at Italian-Thai Development Plc.
Bangkok Metropolitan Area, Thailand
Italian-Thai Development Plc.
Project Engineer
June 2014 to Present
Rayong, Thailand
Italian-Thai Development PCL
Project Engineer
November 2010 to June 2014
Chanthaburi, Thailand
Italian-Thai Development PCL
Senior Cost and Planning Engineer
2009 to 2010
Rayong, Thailand
Italian-Thai Development PCL
Senior Cost and Planning Engineer
2008 to 2009
Laos
Italian-Thai Development PCL
Senior Cost & Planning Engineer at Phu Kham Copper Gold Project
2007 to 2008
Laos
Italian-Thai Development PCL
Senior Cost and Planning Engineer
2006 to 2007
Rayong, Thailand
Italian-Thai Development PCL
Cost and Planning Engineer
2005 to 2006
Sepon Copper Gold Project
Cost Engineer
2004 to 2005
Laos
Italian-Thai Development PCL
Cost Engineer
2001 to 2004
Italian-Thai Development PCL
Cost Engineer
1997 to 2001
Chonburi, Thailand
The Construction of link road with utility system (Stage 1) including fundamental utility system (Stage 2) to PTT project at Wangchan District Construction of asphaltic concrete road approximately 3.7 kilometers long with other infrastructure such as electrical system, fiber optic system, utility building, landscape work etc, total of contract value US$8,630,000 The Construction of link road with utility system (Stage 1) including fundamental utility system (Stage 2) to PTT project at Wangchan District Construction of asphaltic concrete road approximately 3.7 kilometers long with other infrastructure such as electrical system, fiber optic system, utility building, landscape work etc, total of contract value US$8,630,000
What company does Parkin Parnuwasana work for?
Parkin Parnuwasana works for Italian-Thai Development Plc.
What is Parkin Parnuwasana's role at Italian-Thai Development Plc.?
Parkin Parnuwasana is Project Engineer
What industry does Parkin Parnuwasana work in?
Parkin Parnuwasana works in the Civil Engineering industry.
📖 Summary
Project Engineer @ The Construction of link road with utility system (Stage 1) including fundamental utility system (Stage 2) to PTT project at Wangchan District Construction of asphaltic concrete road approximately 3.7 kilometers long with other infrastructure such as electrical system, fiber optic system, utility building, landscape work etc, total of contract value US$8,630,000 From June 2014 to Present (1 year 7 months) Rayong, ThailandProject Engineer @ The Construction of Intake Pump Station and Raw Water Pipeline Transmission with facilities Part 1 The project of raw water transmission from water resouce in Chanthaburi province to water reservoir in Rayong province project , Chanthaburi province, Thailand The Project consists of the construction of an intake pump station and installation of 9 pumps. Each of 9 pumps has a nominal capacity of 0.625 cu.m./s and is driven by 1200kw electric motors. Water transmission pipe line work included the installation of 20 km. of 1.8 m. dia. steel pipe and its facilities. Within 24 months of contract period, total of contract value US$57,600,000 From November 2010 to June 2014 (3 years 8 months) Chanthaburi, ThailandSenior Cost and Planning Engineer @ GHECO-ONE Coal Fired Power Plant Project – Civil and Architectural Works Contract Rayong Provice, Thailand GHECO-ONE Coal Fired Power Plant Project – Civil and Architectural Works Contract comprising of construction of concrete structure, civil work and architectural work in various area of project, total quantity 66,080 Cu.m. of concrete within 34 months of contract period, total of contract value US$25,141,606.06 From 2009 to 2010 (1 year) Rayong, ThailandSenior Cost and Planning Engineer @ Sepon Copper Expansion Project - Concrete Civil Works Contract Savarnnakhet Province, Lao PDR Sepon Copper Expansion Project – Concrete Civil Work Contract comprising of establishment and operation of a concrete batching plant, construction of concrete structure and civil work in various area of project, total quantity 6,050 Cu.m. of concrete within 8 months of contract period, total of contract value US$6,562,648.20 From 2008 to 2009 (1 year) LaosSenior Cost & Planning Engineer at Phu Kham Copper Gold Project @ Phu Kham Copper Gold Project – Concrete Civil Work Contract comprising of construction of concrete structure and civil work in various area of project, total quantity 18,550 Cu.m. of concrete within 12 months of contract period, total of contract value US$12,710,366.37 From 2007 to 2008 (1 year) LaosSenior Cost and Planning Engineer @ ATC Reformer and Aromatics Complex # 2 Project - Civil Works Contract Rayong Province, Thailand ATC Reformer and Aromatics Complex # 2 Project – Civil Work Contract comprising of construction of concrete structure and civil work in various area of project, total quantity 8,510 Cu.m. of concrete within 15 months of contract period, total of contract value US$3,849,074.73 From 2006 to 2007 (1 year) Rayong, ThailandCost and Planning Engineer @ Raw Water Pump Station for Bangpakong – Chonburi Pipeline Project Chonburi Province, Thailand Raw Water Pump Station for Bangpakong-Chonburi Pipeline Project comprising of construction of civil and architectural work for raw water pump station, installation of Ø1400mm steel pipe and riprap raw water pond, contract period 5 months, total of contract value US$2,888,416.09 From 2005 to 2006 (1 year) Cost Engineer @ Sepon Copper Expansion Project – Plant Site Concrete Works, SX/EW Concrete Works, Gold Plant Concrete Works and SX/EW Electrical/Instrument Contract comprising of establishment and operation of a concrete batching plant, construction of concrete structure and civil work in various area of project and also installation and commissioning of electrical and instrument works at SX/EW Area, total quantity 23,080 Cu.m. of concrete within 17 months of contract period, total of contract value US$13,425,280 From 2004 to 2005 (1 year) LaosCost Engineer @ The Central Utilities for the Second Bangkok International Airport Project Samutprakarn Province, Thailand The Central Utilities for the Second Bangkok International Airport Project comprising of construction and commissioning of civil, architectural, electrical and mechanical work for wastewater treatment plant and water supply system including installation of Ø800mm steel pipe, 1,750m long. Contract period 24 months, total of contract value US$14,608,762 From 2001 to 2004 (3 years) Cost Engineer @ The Construction of Laem Chabang Deep Sea Port, Phase 2 Stage 1 Chonburi Province, Thailand Laem Chabang Deep Sea Port, Phase 2 Stage 1 comprising of construction and commissioning of civil, architectural, electrical and mechanical work, works include breakwater, revetment and slope protection, casting and installation of 96 nos. of RC Caissons, removal of silt pond, dredging and reclamation, main quay, passenger berth, service, land leveling, road works, drainage works, railway, building works, water supply system, sewage system, plumbing system, solid waste system, substation, power supply and lighting system, communication and mechanical system. Contract period 36 months, total of contract value US$307,451,394.20 From 1997 to 2001 (4 years) Chonburi, ThailandBachelor's Degree, Civil Engineering @ Khon Kaen University From 1992 to 1995 Parkin Parnuwasana is skilled in: Civil Engineering, Engineering, Road, Drainage, Construction, Project Engineering, AutoCAD, Microsoft Office, Project Management, Concrete, Project Estimation, Primavera P6, Construction Management, Project Control, Highways
Introversion (I), Intuition (N), Thinking (T), Judging (J)
1 year(s), 9 month(s)
Unlikely
Likely
There's 89% chance that Parkin Parnuwasana is seeking for new opportunities
Enjoy unlimited access and discover candidates outside of LinkedIn
Trusted by 400K users from
76% of Fortune 500 companies
The most accurate data ever
Hire Anyone, Anywhere
with ContactOut today
Making remote or global hires? We can help.
No credit card required