Pre-Construction Lead @ From July 2015 to Present (6 months) Lead Commercial Manager - Social Infrastructure @ Lead Commercial Manager for the Social Infrastructure Business Unit responsible for the financial performance and compliance of Health, Education and Custodial projects nationwide. From March 2014 to July 2015 (1 year 5 months) Lead Commercial Manager - Justice Sector @ Lead Commercial Manager for the Justice Sector responsible for the financial performance and compliance of custodial projects nationwide.
Projects include a number of Courts and Prisons both new build and refurbishment.
Key responsibilities include full P&L responsibility, business planning, strategy setting and implementation, risk management and tender adjudication. From March 2013 to March 2014 (1 year 1 month) Senior Commercial Manager @ Pre-Construction 2012-2013 - Responsible for all Pre-Constract and Bid Activities on a range of Projects from £1m - £30m
Academies Programme, George Dixon Four Dwelling and Dorrington Schools, Birmingham BSF, UK
2011-2013. Lead Commercial Manager for E-Act Academies, George Dixon, Four Dwellings and Dorrington Schools, under the Birmingham BSF Programme namely the new Build of Shenley £23m, Heartlands £20m and North Birmingham £23m Academies and the refurbishment and New Build Elements of George Dixon £19m, Four Dwellings £13m and the New Modular Primary School at Dorrington £1m, responsible for all Commercial Aspects of the Projects, Managing a Surveying Team on each project.
Stockland Green Technology College, Birmingham BSF, UK - £17m (Lend Lease Midlands Project of the Year 2010-11)
2009-10. Design and Build (PFI) of new Technology College for 750 pupil consisting of 7500m2 with a separate academic block and Sports Hall located on the existing Schools Car park adjacent to the school and separately administered college.. Responsible for all commercial aspects of this project.
Birmingham Building Schools for the Future (BSF)
2006-09. Major Building Schools for the Future Scheme. Pre-Construction works on the samples schemes for a large Building schools for the future programme from initial PQQ through to FC. Responsible for all Commercial Pre Contract Development and Cost Planning for Stockland Green Technology College and Fittings Furniture and Equipment on all schemes through to Financial Close.
Adelaide Wharf / KX200 (London)
2008, Review and Settlement of Sub-Contractor Final Accounts and on 2 separate Mixed use Accommodation Projects.
First Base Projects (London)
2006-2007, Provision of early feasibility and cost advice to client from inception of projects. From December 2006 to February 2013 (6 years 3 months) Quantity Surveyor @ Orion Phase 2, John Bright Street, Birmingham, UK - £22m (Shepherd Construction Limited)
2006. Major new Design & Build of 15 storey Mixed Use Commercial and Residential development on a confined site adjacent to the main route through Birmingham City Centre with connections through into the Orion Phase 1 development. Responsible for the Envelope and Fit-out packages and Main Contract Valuation.
Orleans Building and Birmingham School of Speech and Drama Demolition and Façade Retention, Birmingham, UK – 0.5m (Shepherd Construction Limited)
2006. Demolition of Birmingham School for Speech and Drama and Orleans building on John Bright Street, including for the retention of the Façade. Working on a confined site that was bounded by the main route through Birmingham city centre and the ongoing phase one development. Responsible for all commercial aspects of this project.
B5 Southside, Birmingham, UK - £40m (Shepherd Construction Limited)
2004-2006. Major new design and build of Mixed use Commercial and Residential development including for 460 Apartments and 9 Commercial Units built as a mix of in-situ concrete and Post Tensioned Concrete slabs. Responsible for the Envelope and Fit-out packages and Main Contract Valuation.
University of Central England, New Technology Institute , Birmingham, UK - £6m (Shepherd Construction Limited)
2005. Design and Build of Further Education building consisting of 5 stories.. Responsible for the Procurement of Internal Fit-Out Packages.
Alton Towers Project Destination, Staffordshire, UK - £30m (Shepherd Construction Limited)
2002-2004. Design and Build of Themed 216 Bedroom Hotel, Waterpark and Conference Centre. Including for a high standard fit-out for the Conference Centre and a Themed fit out for the Waterpark and Hotel. Responsible for the Fit-Out Packages. From July 2002 to December 2006 (4 years 6 months)
BSc, Quantity Surveying @ Birmingham City University From 2002 to 2007 Jonathan MRICS is skilled in: PFI, Commercial Management, Cost Planning, Quantity Surveying, Refurbishing, Construction, Value Engineering, Construction Management, FIDIC, Cost Reporting, Concrete, Procurement, Tender Preparation, Cost Engineering, Feasibility Studies