Senior Project Manager at DeBrine Associates
Oakland, California
Senior Project Manager @ DeBrine Associates Currently working as a Sr. Project Manager consultant for a confidential client, managing a multitude of projects. San Mateo, CaliforniaSr. Project Manager @ Rudolph and Sletten Hewlett Packard Enterprise Building 20 Level C -Tenant Improvement, Palo Alto120,000sf demo of existing Ti and rebuild to new look and feel standards. Project was...
Senior Project Manager @ DeBrine Associates Currently working as a Sr. Project Manager consultant for a confidential client, managing a multitude of projects. San Mateo, CaliforniaSr. Project Manager @ Rudolph and Sletten Hewlett Packard Enterprise Building 20 Level C -Tenant Improvement, Palo Alto120,000sf demo of existing Ti and rebuild to new look and feel standards. Project was coordinated and built in an occupied building with off hour and swing shift work to mitigate interruption to employees. Scope also included upgrades to existing building, HVAC and life safety systems. Project included demolition of a waffle slab in the interior of the building and erecting a new stairwell between two occupied levels with structural supports that had to be coordinated through 3 occupied levels of the building.$18,000,00/comp April 2017Hewlett Packard Enterprise Building 20 Level C Cafe, Palo AltoDemo and rebuild of existing cafe including hookup of new equipment and code required upgrades to building systems, coordination with City, San Mateo Health department for permitting and review. $1,896,649/comp February 2017Hewlett Packard Enterprise B1U Tenant Improvements Phase 2 and Sitework, Palo AltoDemo and upgrades to exist B1 U space including upgrades to conference rooms, open offices, stairwells. Addition of new door ways and entry to B1U including review architectural review coordination with City of Palo Alto and coordination of installation.$1,559,603/comp February 2017Hewlett Packard Enterprise Building 20 Misc. Tenant Improvements & Repair ,Palo AltoVariety of special projects including upgrades to IT Help desk, Executive Suite Upgrades, conference room upgrades, server room upgrades. site work and utility upgrades.$1,052,121/comp feb 2017Hewlett Packard Inc. AT&T Site Infrastructure, Palo AltoInstallation of 400 feet of underground conduits and new AT&T splice boxes for providing new fiber service into the campus.$228,750/comp Dec 2016 From February 2016 to July 2017 (1 year 6 months) Project Engineer @ Rudolph and Sletten Molecular Foundry - Lawrence Berkeley National Laboratory95,000sf 6-story research laboratory building consisting of dry labs, wet labs for organic and synthetic chemistry research, Class 100 and 1,000 clean room areas for nanoscience research, and a detached central plant. Achieve LEED Gold NC and 75% of the construction waste was recycled and the energy consumption is 30% below the state's average.$52,613,565/completed March 2006 Project Engineer at Sacred Heart Schools - Performing Art Center 28,500sf performing arts center including a 21,000sf auditorium with 350 fixed seats, 3,000sf public lobby and restrooms, 1,200sf rehearsal studio, approximately 3,500sf of technical, production, and performer support spaces, and renovation of Palm Court Plaza.$10,500,000/completed November 2004 From January 2004 to March 2006 (2 years 3 months) Project Manager @ Rudolph and Sletten Tenant Improvement for Confidential Client, Santa Clara4,500sf Tenant improvement of existing shelled space. Scope included restrooms, conference rooms, reception and waiting areas and break rooms. Scope included repurposing existing mechanical systems and upgrading all electrical systems to Title 24 requirements.$550,000/comp January 2016Hewlett Packard Inc. - Site Fire Pump Replacement, Palo AltoReplacement of the existing fire pump on the Palo Alto campus that feeds the existing Buildings 1501 and 20, including temporarily connecting the fire line to the city water and removing the existing pump and installing new housekeeping pads, fire pump, fuel oil system and monitoring of the pump.$432,504/comp November 2015Hewlett-Packard Enterprises New Style of IT (NSoIT), Palo AltoExecutive Briefing Center (Building 20 Annex) tenant improvements, including new gallery and theater for the user experience.$1,750,461/comp October 2015California Memorial Stadium Tenant Improvements Phase 1, Berkeley15,000sf renovation and buildout of 3 separate spaces within the newly remodeled California Memorial Stadium.$2,971,638/comp August 2015Hewlett-Packard Building 20A CDC Laboratory Tenant Improvements, Palo Alto$178,043/comp August 2015HPE - B1 Upper and B2 Upper Tenant Improvements Phase 1, Palo Alto20,000sf tenant improvements for B1U (13,000sf) and B2U (7,000sf) including new main lobby for HP Labs, new conference rooms with VC3 capabilities, new executive offices, new open offices with cubicles, new IDF closet, and remodel of existing offices.$1,086,024/comp April 2015 Hewlett-Packard Enterprise Building 6 Lab CRAC Units, Palo AltoThree (3) new computer room air conditioning (CRAC) units for Building 6 laboratory.$147,613/comp January 2015Hewlett-Packard Aviation Avenue Parking Lot, San Jose65,000sf parking lot replacement, including 3" lift of asphalt over existing base and repainting of existing asphalt and curbs.$264,103/comp August 2014 From July 2014 to January 2016 (1 year 7 months) Project Manager @ Rudolph and Sletten California State University, Monterey Bay Academic II Building, Seaside58,000sf new academic building houses the Schools of Business and Information Technology & Communication Design (ITCD), including a lecture hall, faculty offices, classrooms, lounge area, conference rooms, and ITCD laboratories. Exterior spaces provide linkages to the main quad, crescent walkway, and the Tanimura and Antle Family Memorial Library. LEED Gold NC.$33,183,077/comp July 2015California State University, Bakersfield - Art Center and Satellite Utility Plant16,000sf 1-story art center will consist of multiple teaching labs, restrooms, lockers, equipment storage, repair shop, yards and other support areas necessary to function as a state-of-the-art arts center, including a new satellite plant (MEP utility) with a 3,000sf plant building and 1,000sf cooling tower enclosure and 600,000 gallon thermal energy storage tank.$15,379,818/comp May 2014Thermo Fisher Scientific Inc.Pleasanton Laboratory and Office Tenant Improvements (Preconstruction Only), Pleasanton30,000sf tenant improvements in an occupied building, including global operations, medical science lab, Building F, and 2nd floor Optimus Lab.$12,970/comp March 2014 Hewlett-PackardExecutive Briefing Center (Building 20 Annex), Palo Alto59,900sf annex addition and update provides a new "Campus Entry" and focal point for the HP World Headquarters, including a renovated auditorium and transition spaces and houses the Executive Briefing Center where HP showcases their product lines to potential customers from around the world. Achieved LEED Platinum CI. $43,000,000/comp December 2012 Hewlett-PackardBuilding 20 Office Tenant Improvements, Palo Alto216,000sf tenant improvements on levels A, B and D, including open office floor space with associated amenities and infrastructure, executive center, conference rooms, ancillary space and 2,000sf of restrooms which were remodeled and upgraded. $34,000,000/comp September 2012 From April 2011 to June 2014 (3 years 3 months) Senior Project Engineer @ Rudolph and Sletten Solyndra Fab 2 - Front End580,000sf new thin-film solar equipment manufacturing facility which contain 300,000sf of manufacturing plant floor area and mezzanine utility floor with Class 100,000 (ISO 8) clean room space, 35,000sf of administrative and professional office space and a 84,000sf central utility plant.$239,000,000/comp July 2010 Moffett Towers Parcel 3 1,409,310sf new building construction on a 52-acre Bay Mud site consisting of (3) eight-story buildings, (1) 44,000sf amenities building with cafeteria, a five-story parking garage with 1,571 spaces, site parking lot with 1,200 spaces, new roads, demolition and associated sitework. The office buildings were registered for LEED Silver CS, but achieved LEED Gold CS. The amenities building is LEED Gold NC certified.$157,771,933/comp July 2009 Genetech -B3B - Small Scale Clinical Manufacturing Facility Expansion17,709sf new 3-story building addition built on Bay Mud and partial first and second floor buildout of cGMP manufacturing space.$25,590,972/comp June 2007 From April 2006 to March 2011 (5 years) Project Engineer Intern @ Rudolph and Sletten Project Engineer Intern at the UC Berkeley Unit 1 and 2 Housing Project311,000sf new residence halls on UC Berkeley campus that included (4) new 8-story structures of CIP concrete, adding 214 new units with 884 beds to the university's housing market. The project was designed to meet LEED Gold NC.$92,062,403/completed April 2005 From January 2003 to August 2003 (8 months)
DeBrine Associates
Senior Project Manager
San Mateo, California
Rudolph and Sletten
Sr. Project Manager
February 2016 to July 2017
Rudolph and Sletten
Project Engineer
January 2004 to March 2006
Rudolph and Sletten
Project Manager
July 2014 to January 2016
Rudolph and Sletten
Project Manager
April 2011 to June 2014
Rudolph and Sletten
Senior Project Engineer
April 2006 to March 2011
Rudolph and Sletten
Project Engineer Intern
January 2003 to August 2003
Currently working as a Sr. Project Manager consultant for a confidential client, managing a multitude of projects. Currently working as a Sr. Project Manager consultant for a confidential client, managing a multitude of projects.
What company does John Abraham work for?
John Abraham works for DeBrine Associates
What is John Abraham's role at DeBrine Associates?
John Abraham is Senior Project Manager
What industry does John Abraham work in?
John Abraham works in the industry.
Enjoy unlimited access and discover candidates outside of LinkedIn
One billion email addresses and counting
Everything you need to engage with more prospects.
ContactOut is used by
76% of Fortune 500 companies
John Abraham's Social Media Links
/company/d... /school/te... /redir/red...